Photo By: Kevin Morgan
 

About a half mile from the east switch of Tolland, the tracks cross over from the far side of South Boulder Creek to the near side (with respect to the road). Coming around the curve to the bridge which takes the tracks across, the MNYRO is on the move. The train will enter the siding at Tolland to wait for an eastbound coal train that was in the Moffat Tunnel at the time this picture was taken.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1430
views
0
comments
Friday, September 16, 2011 at 11:37:33 AM
image date



Location Information
City or County and State
Tolland, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
MP 46




Train Information
Railroad
Union Pacific
Model
AC4400CW
Unit Number
UP 7134

Symbol
MNYRO-16
   



Photo Information
Camera Make/Model
Canon / Canon EOS 40D
ISO
200
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/250 seconds
Aperture
f/7.1


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.