Photo By: Kevin Morgan

Weeks before the Moffat maintenance project began, a work train loaded with ties came along and drop off piles of ties along the rails. Today, with the ties ready to be replaced, these guys are picking up the ties and loading them onto a platform so they can be taken to the specific spot they are needed.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

878
views
0
comments
Tuesday, October 3, 2017 at 7:40:34 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Leyden (7,020ft)




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
1600
Flash
Did Not Fire

Focal Length
400 mm
Shutter
1/320 seconds
Aperture
f/7.1


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.