Photo By: Kevin Morgan

After waiting for a handful of westbounds, this eastbound coal load now has a clear signal at Bridger Jct to head east on the BNSF Canyon Sub on Main 1.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

587
views
0
comments
Friday, May 29, 2020 at 5:24:25 PM
image date



Location Information
City or County and State
Orin, WY

Subdivision
Canyon (BNSF)

Milepost or Control Point
Bridger Jct




Train Information
Railroad
BNSF
Model
ES44AC
Unit Number
BNSF 5766



Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/800 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.