Photo By: Kevin Morgan
 

A BNSF coal load slowly grinds up the grade just south of Greenland. The train is just a few miles away from the "top of the hill" at Palmer Lake. There, the train will have successfully conquered Palmer Divide, and will continue downgrade on the single track main.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

136
views
0
comments
Sunday, October 15, 2023 at 1:19:53 PM
image date



Location Information
City or County and State
Greenland, CO

Subdivision
Colorado Springs (UP)/Pikes Peak (BNSF)

Milepost or Control Point
Greenland




Train Information
Railroad
BNSF
Model
SD70ACe
Unit Number
BNSF 9015

Symbol
CATMCRD-031
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 [FC4170]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/400 seconds
Aperture
f/4.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.