Two SW1500's work hard to pull a string of Xcel Energy hoppers into North Yard. The switchers are headed down the old Belt Industrial Lead into North Yard. The two tracks in the foreground are bypass mains two and one (from left to right). The tracks lead from the Belt Industrial Lead to C&S Junction.
Email Questions or Comments to the Webmaster.