After loosing a piece of metal frame sticking up from the damaged grade crossing, the engineer onboard SKTX 242 takes the Ski Train across the grade crossing at "walking speed". Members of the Ski Train crew monitor the crossing from a safe distance to ensure no additional problems develop. After the entire train was clear of the crossing without incident, the crew walked back to the head-end and the train continued into town.
Email Questions or Comments to the Webmaster.