Photo By: Kevin Morgan
 

On rather "blah" weather day, the southbound HLAUDEN is on the approach to the north siding switch Broomfield. The train will hold the main track at Broomfield to wait for the QDENTAC to take the siding at Broomfield. Note that the second and third units are both in the Warbonnet scheme. The peak in the background is Longs Peak. Also, the buildings in the background are a part of the StorageTek facility. The campus was recently purchased and will be rebuilt in the next three or four years.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1670
views
0
comments
Wednesday, February 20, 2008 at 12:28:25 PM
image date



Location Information
City or County and State
Broomfield, CO

Subdivision
Front Range (BNSF)

Milepost or Control Point
MP 16




Train Information
Railroad
BNSF
Model
C44-9W
Unit Number
BNSF 653



Photo Information
Camera Make/Model
Canon / Canon EOS 20D
ISO
100
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/320 seconds
Aperture
f/11


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.