Photo By: Kevin Morgan
 

Approach the east switch at Rocky, the westbound Ski Train has an Advanced Approach (high flashing yellow) signal. The train will be meeting an eastbound manifest (the MRONY-04) at Clay. The manifest is holding the main, but does not fit between switches. The Ski Train will run through the siding, waiting for the manifest to clear, and then continue west.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

3093
views
0
comments
Thursday, March 6, 2008 at 8:14:33 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Rocky (DS016)




Train Information
Railroad
Ski Train
Model
F40PH
Unit Number
SKTX 242

Past Number(s)
ex- AMTK 242
Future Number(s)
CN 104



Photo Information
Camera Make/Model
Canon / Canon EOS 20D
ISO
100
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/250 seconds
Aperture
f/10



(Pre-SKTX 242) - Photos of AMTK 242

1/31/2004

6/19/2003

3/9/2003

2/15/2003

7/20/2002

6/29/2002

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.