About halfway through the siding of Rocky, a UP coal empty has a clear signal on the main track. Meanwhile, a ballast train is tied down on the Rocky Spur in the background. The tracks at Clay, almost three track miles ahead, are visible above the ballast train power.
Email Questions or Comments to the Webmaster.