Railroad photograph
Photo by: Kevin Morgan
At Palmer Lake, ABS and Track Warrants end, as do two tracks. This coal load is wrapping around the sound end of Palmer Lake on the single track (CTC) main. It is now 32 miles of single track (with four sidings) until double track starts again at Crews.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1965
views
0
comments
Saturday, September 06, 2008 at 15:00:23
image date



Location Information
City or County and State
Palmer Lake, CO

Subdivision
Colorado Springs (UP)/Pikes Peak (BNSF)

Milepost or Control Point
Palmer Lake (MP 52)




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 6022

Paint Scheme
Symbol
Train Type
Coal



Photo Information
Camera Make/Model
Canon / Canon EOS 20D
ISO
100
Flash
Did Not Fire

Focal Length
28 mm
Shutter
1/320 seconds
Aperture
f/6.3