Photo By: Kevin Morgan
 

For decades, coal for the Valmont power plant has come from western Colorado. However, starting in November 2008, the coal is now coming from the Powder River Basin in Wyoming. BNSF now gets all the business (whereas UP ran the train to and from the mine). BNSF will route the loaded train down the Brush Sub and the empty north on the Front Range Sub. Here is the first train headed north on on the Sub, approaching the Foothills Blvd Underpass.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1787
views
0
comments
Saturday, November 15, 2008 at 2:18:56 PM
image date



Location Information
City or County and State
Boulder, CO

Subdivision
Front Range (BNSF)

Milepost or Control Point
MP 28




Train Information
Railroad
BNSF
Model
ES44AC
Unit Number
BNSF 6124

Symbol
E-LONBTM0-01A
Paint Scheme
 



Photo Information
Camera Make/Model
Canon / Canon EOS 40D
ISO
100
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/250 seconds
Aperture
f/7.1


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.