Photo By: Kevin Morgan
 

It took crews about 48 hours to cleanup, repair and reopen the tracks through the Littleton Trench after the derailment on January 17, 2009. A little over a week later, a coal load heads south on Main 3, leaving the trench behind. A couple sets of Herzog trains work on Main 1 in the distance.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1860
views
0
comments
Sunday, January 25, 2009 at 9:37:22 AM
image date



Location Information
City or County and State
Littleton, CO

Subdivision
Colorado Springs (UP)/Pikes Peak (BNSF)

Milepost or Control Point
MP 11




Train Information
Railroad
BNSF
Model
ES44AC
Unit Number
BNSF 5765

Symbol
CWTAMJ-22 (UP smbl)
Paint Scheme
 



Photo Information
Camera Make/Model
Canon / Canon EOS 40D
ISO
320
Flash
Did Not Fire

Focal Length
65 mm
Shutter
1/250 seconds
Aperture
f/5


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.