The crew on this coal load is throttling up, ready to leave the siding of Carr north on a clear signal. The train will have to go as quick as it can up to Speer as the ZLADV will be there before long, ready to head south to Denver. The flat car sitting on the house track to the right has been there for over six months. The car literally broke in two on a work train. It was welded back together (as a temporary fix) and was setup here. UP hasn't gotten around to dealing with it yet. More than likely, the car will be cut up and scrapped right here, on the spot.
Email Questions or Comments to the Webmaster.