Posted By Rob Miller On Friday, June 3, 2011 At 3:06:19 AM (PT)
Cool site
Posted By Jon Hontz On Saturday, January 22, 2011 At 4:25:52 PM (PT)
The North Lead is actually being moved, not re-moved. If you head over toward 13th Ave, you can look North and see that the new lead already has a switch and some trackage, complete with trenching dug for the rest of the journey to Burnham. The NB signals at Walnut will also be moved, which has been a long time coming since their current position makes them difficult to see and trains hold South of 13th anyway.