Photo By: Kevin Morgan

As part of the addition of a second main track, UP has laid the (concrete) ties and rails on the north side of existing main between Pierce Street and Sheridan. The ballast has yet to be laid. In this shot, the new track will end up being Main 1 and the existing track will be Main 2. However, around the bend, the alignments will shift slightly and the existing track will become Main 1 and a new track (yet to be laid on the south side of the existing track) will become Main 2.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1330
views
0
comments
Sunday, August 28, 2011
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
MP 7




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
Paint Scheme  


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.