At east Plain, an exceptionally lengthy MNYGJ takes the siding to meet an eastbound coal load. At 6,530 feet, Plain is not a short siding. Yet the MNYGJ only cleared the east switch by about five cars once it was in the clear!
It would seem that the lead unit is going to have some difficulties flying, what with only half a wing at all...