Photo By: Kevin Morgan

An eastbound manifest comes around on the new mainline alignment toward Sheridan. UP is preparing to realign the Arvada Siding to change it into Main 2.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1581
views
0
comments
Sunday, February 26, 2012 at 9:27:47 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Arvada Siding (MP 7 to MP 8)




Train Information
Railroad
BNSF
Model
C44-9W
Unit Number
BNSF 5438

Symbol
QPVDVJ-24
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 40D
ISO
200
Flash
Did Not Fire

Focal Length
300 mm
Shutter
1/500 seconds
Aperture
f/13


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.