Photo By: Kevin Morgan
 

Brrr! An on-time Zephyr is running on clear signals as it enters the east end of Leyden on the main. The train is passing the MNYRO, which will depart right behind the Zephyr so both may continue heading west. The snow should help to get the foliage nice and green!
Email Questions or Comments to the Webmaster.
User Comments (1)

Posted By Reg LLOYD On Sunday, May 6, 2012 At 9:54:58 PM (PT)

VERY GOOD.Hope you kept yourself warm whirlst taking the shots.If you can send me a postal address so I can write to you.I have my latest TSL tsl210 vol.35. no.5.Thanks very much.R.L.

Add Comment ]

2414
views
1
comments
Tuesday, April 3, 2012 at 8:36:07 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS012 (East Leyden)




Train Information
Railroad
Amtrak
Model
P42DC
Unit Number
AMTK 4

Symbol
AMT5-02
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
400
Flash
Did Not Fire

Focal Length
52 mm
Shutter
1/800 seconds
Aperture
f/10


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.