Photo By: Kevin Morgan
 

MAIN TWO IS COMPLETE! After nearly a year of construction (start to finish), UP completed Main 2 between C&S Junction and Arvada on May 8, 2012. Here, a few days after opening, a westbound UP coal empty on Main 2 meets the eastbound Beer Run near Sheridan Blvd. The Beer Run will run down to C&S Junction and cross from the Golden Sub to Main 2 and then to Main 3 on in to the yard.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1862
views
0
comments
Friday, May 11, 2012 at 8:13:27 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Arvada Siding (MP 7 to MP 8)




Train Information
Railroad
BNSF, Union Pacific
Model
C44-9W
Unit Number
BNSF 4675

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
800
Flash
Did Not Fire

Focal Length
18 mm
Shutter
1/500 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.