Photo By: Kevin Morgan

The dispatcher set up a perfect meet at Mesa between a westbound coal empty (to the right, in the siding) and an eastbound manifest (to the left, on the main). The coal empty would ultimately tie down here in the siding as there was no spot for it (yet) on either of the bypass tracks at North Yard. The manifest is the daily MDVSI and would continue east to Salina, KS.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1249
views
0
comments
Sunday, March 2, 2014 at 2:57:48 PM
image date



Location Information
City or County and State
Aurora, CO

Subdivision
Limon (UP)

Milepost or Control Point
Mesa (8,880ft)




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
200
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/250 seconds
Aperture
f/14


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.