Photo By: Kevin Morgan
 

Running nearly three hours late, the westbound Zephyr passes by a lot of work on the new commuter rail being constructed north and west of Denver. The Zephyr is running on Main 2, which is typical of most trains between Arvada and C&S Junction. The commuter rail is being constructed parallel to the tracks, and there is a Form B on Main 1 during the day to protect construction workers.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1494
views
0
comments
Wednesday, October 1, 2014 at 11:20:56 AM
image date



Location Information
City or County and State
Arvada

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Arvada Siding (MP 6 to MP 7)




Train Information
Railroad
Amtrak
Model
P42DC
Unit Number
AMTK 207

Symbol
AMT5-30
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
200
Flash
Did Not Fire

Focal Length
120 mm
Shutter
1/400 seconds
Aperture
f/11


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.