Photo By: Kevin Morgan

On the last day of 2014, a crew takes the westbound Beer Train slowly toward Golden. The train is limited to 10 MPH through this section of track. There is a lot of construction happening here as part of the new commuter line (the Gold Line). Note the polls that will be part of the catenary once the Gold Line opens in 2016.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1397
views
0
comments
Wednesday, December 31, 2014 at 12:54:02 PM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Golden (BNSF)

Milepost or Control Point
Parfet Street




Train Information
Railroad
BNSF
Model
None
Unit Number
None

Symbol
MDENGOL
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
200
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/800 seconds
Aperture
f/9


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.