A northbound Powder River Basin-bound coal empty sits stopped at milepost 12 alongside Church Ranch Lake. The train is waiting to meet a southbound at Broomfield. The coal train is too long, however, to fit in the siding without blocking any crossing. Once the southbound gets closer, the dispatcher will let this guy know that he can continue pulling in to the siding.
Email Questions or Comments to the Webmaster.