Photo By: Kevin Morgan

Two westbounds sit side-by-side at Tolland, both waiting to see who gets to continue west first. At a glance, how can you easily tell which train is on the main and which is on the siding? If you look at the track to the left, note that there are regular joints in the rail periodically. Not the case for the track to the right. That indicates the track to the left, having "jointed" rail, is the siding. The mainline has welded rail.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1419
views
0
comments
Saturday, March 14, 2015 at 9:11:19 AM
image date



Location Information
City or County and State
Tolland, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tolland (9,356 ft)




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
250
Flash
Did Not Fire

Focal Length
300 mm
Shutter
1/400 seconds
Aperture
f/9


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.