Photo By: Kevin Morgan

A close look at the new (south) switch at Broomfield. Obviously not nearly complete yet, once this switch is moved, the siding of Broomfield will no longer have any grade crossing. This is part of a project that will connect 120th Avenue and CO-128 in Broomfield. In order for the two roads to be connected, they must run underneath BNSF's Front Range Sub. That underpass does not exist today and has not yet been started. But the underpass would pass underneath both the main and the siding. With the relocation of the south switch (shifting the siding north), the tracks can switch from the main line alignment to the siding alignment and back during construction of the the underpass, while still maintaining the use of the Broomfield siding.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1467
views
0
comments
Friday, June 26, 2015 at 12:52:41 PM
image date



Location Information
City or County and State
Broomfield, CO

Subdivision
Front Range (BNSF)

Milepost or Control Point
Broomfield (8,976ft)




Train Information
Railroad
BNSF
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
250
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/500 seconds
Aperture
f/11


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.