Photo By: Kevin Morgan

An eastbound BNSF manifest slowly rolls in to the siding at Crescent to wait for a westbound UP coal empty. There is a grade crossing located near the middle of the siding (located at MP 31.35). The road is Gross Dam Road, so named because it eventually leads to Gross Dam.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1252
views
0
comments
Sunday, July 5, 2015 at 3:00:59 PM
image date



Location Information
City or County and State
Boulder County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Crescent (5,550 ft)




Train Information
Railroad
BNSF
Model
None
Unit Number
None

Symbol
HPVODEN1-04A
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
400
Flash
Did Not Fire

Focal Length
55 mm
Shutter
1/400 seconds
Aperture
f/10


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.