Photo By: Kevin Morgan
 

The process of wying the Cheyenne Frontier Days special is roughly halfway complete. The train is at Speer Jct, about eight miles outside Cheyenne. Here, the train is coming down one leg of the wye. This leg connects Mains 3 and 4 with the Greeley Subdivision toward Denver.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1528
views
0
comments
Saturday, July 18, 2015 at 11:59:12 AM
image date



Location Information
City or County and State
Laramie County, WY

Subdivision
Laramie (UP)

Milepost or Control Point
UP 951




Train Information
Railroad
Union Pacific
Model
E9
Unit Number
UP 951

Symbol
PDVDV2-18
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 40D
ISO
200
Flash
Did Not Fire

Focal Length
220 mm
Shutter
1/500 seconds
Aperture
f/11


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.