A BNSF SD70ACe and a KCS ES44AC lead a westbound coal load down the main just outside BNSF's Denver Yard. BNSF is sinking some money in the east end of the yard in 2015. The tracks called "Coal 1" and "Coal 2" (where westbound coal train will typically stop to recrew) are being extended. They will be long enough to support 140-car trains when construction is complete. As part of the construction, a new signal bridge has been installed! The signal on the left will be for the main and the other two signals for Coal 1 and Coal 2.
Email Questions or Comments to the Webmaster.