The siding of Muir is about 8,685 feet long and leads right up to the east portal of Bozeman Tunnel. The head end of this manifest has just emerged from the tunnel, while a good portion of it remains back in the tunnel. The siding is the only one between the Bozeman Pass Summit and Livingston Yard, located roughly 12 miles to the east.
Email Questions or Comments to the Webmaster.