Photo By: Kevin Morgan

As sunlight starts to come over the hill, the work at East Leyden is apparent. UP is in the process of replacing the signals at the east switch. West Crescent and East Cliff were the first signals to be replaced along the Moffat. That happened nearly 15 years ago! Now, some of the last Rio Grande signals will come down, giving way to new, taller, brighter, LED signals.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1377
views
0
comments
Monday, September 28, 2015 at 7:13:31 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS012 (East Leyden)




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
Apple / iPhone 6s Plus
ISO
32
Flash
Did Not Fire

Focal Length
4.15 mm
Shutter
1/120 seconds
Aperture
f/2.2


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.