Photo By: Kevin Morgan

It is just a few minutes before the sun crests the horizon on a frigid New Year's Eve as an eastbound BNSF manifest approaches Tennyson Street on Main 1. Behind the train and to the right of the frame, you can see a lot of infrastructure for the new RTD Gold Line commuter line, set to open in Fall of 2016. An interesting note is that this is the very last eastbound BNSF train that won't be crewed by a Grand Junction based crew. Starting January 1, 2016, BNSF eliminated the crew change point in Kremmling. Grand Junction crews now take BNSF trains from Grand Junction as far east as they can. It is actually probable that a BNSF train at this location will have a Denver based crew as a Grand Junction crew likely won't be able to reach Denver. So a Denver crew will "dog catch" the train somewhere west of town.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1419
views
0
comments
Thursday, December 31, 2015 at 7:27:43 AM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tennyson Street




Train Information
Railroad
BNSF
Model
None
Unit Number
None

Symbol
HPVODEN1-30A
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
800
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/250 seconds
Aperture
f/7.1


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.