Photo By: Kevin Morgan
 

A lot has changed in this view in the last ten years. The Sheridan Blvd overpass, which the train is running beneath, was completely rebuilt. That was done to provide enough room for commuter rail to fit underneath the bridge, which is on the opposite side of this coal empty. There are now two main tracks here for UP, the second completed just a few years ago. One thing that isn't new is the stub track in the foreground! It connects in with BNSF's Golden Sub and hasn't been used in a few years.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1432
views
0
comments
Monday, March 7, 2016 at 1:20:21 PM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Arvada Siding (MP 6 to MP 7)




Train Information
Railroad
Union Pacific
Model
ES44AC
Unit Number
UP 7695

Symbol
CPSEY-07
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
1600
Flash
Did Not Fire

Focal Length
22 mm
Shutter
1/320 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.