Photo By: Kevin Morgan

This consist is headed for Tabernash where, over the course of a few days, the train will make several round trips between Tabernash and East Portal. This will allow EMD to test the performace of their new SD70ACe-T4 both in high altitudes, and in tunnels. The UP units will be onhand to offer assistance, should it be needed.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1175
views
0
comments
Monday, March 7, 2016 at 2:09:28 PM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Rocky (7,330ft)




Train Information
Railroad
Union Pacific, Electro-Motive Division
Model
None
Unit Number
None

Symbol
SDVTN-07
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
1000
Flash
Did Not Fire

Focal Length
275 mm
Shutter
1/400 seconds
Aperture
f/9


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.