With the westbound Zephyr now west of Tabernash, the EMD special can start its testing. In this shot, all the UP power is throttled up and pulling the train toward the east end of the siding. The EMD prototypes are isolated from the UP power (meaning they are being controlled independently by someone in the cab) and not currently loading.
Email Questions or Comments to the Webmaster.