Railroad photograph
Photo by: Kevin Morgan
An eastbound double stack rolls in to Cheyenne on Main P2. Cheyenne has four main tracks (P1 - P4) located outside the depot. Cheyenne is a crew change point and these four tracks are used for crew changes on all trains coming through. Most trains only stop for 10-15 minutes for the crew change, and then continue on their journey. The dispatcher had to work with only three tracks this Saturday, with Cheyenne Frontier Days sitting on P1. An eastbound double stack coming in to town on P2. Another double stack is visible to the left on P4.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1611
views
0
comments
Saturday, July 23, 2016 at 13:34:43
image date



Location Information

City or County and State
Cheyenne, WY

Subdivision
Laramie (UP)

Milepost or Control Point
Cheyenne Depot




Train Information
Railroad
Union Pacific
Model
ES44AC
Primary Unit Number
UP 7723

Paint Scheme
UP Flag/Lightning/Wings
Symbol
Train Type
Intermodal



Photo Information
Camera Make/Model
Canon / Canon EOS-1D Mark III
ISO
400
Flash
Did Not Fire

Focal Length
310 mm
Shutter
1/400 seconds
Aperture
f/8