Photo By: Kevin Morgan

For close to 72 hours, Union Pacific had the Moffat completely shut down (late 10/09/13 to late 10/12/13). It was reported that there were some "soft spots" in the last two miles of track at the west end of the Moffat Tunnel itself. UP took the line out of service, removed the track, and effected repairs. Part of that meant new ballast! Here, a ballast train that had been at East Portal returns to Denver as the repairs are complete.
Email Questions or Comments to the Webmaster.
User Comments (1)

Posted By Bill Nagel On Thursday, October 20, 2016 At 10:27:04 AM (PT)

I also saw this train at Crescent and on 10-14-16 going North through Greeley. Looked like most of the cars were loaded.

Add Comment ]

1478
views
1
comments
Thursday, October 13, 2016 at 12:58:59 PM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Chemical (MP 14.5)




Train Information
Railroad
Union Pacific
Model
ES44AC
Unit Number
UP 7350

Symbol
WEPNYB-13
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS-1D Mark III
ISO
200
Flash
Did Not Fire

Focal Length
210 mm
Shutter
1/400 seconds
Aperture
f/11


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.