Photo By: Kevin Morgan

This eastbound manifest is about to knock down the signal at the west end of Leyden and head into the siding. DS-86 informed the train that BNSF's 31st Street Yard is not ready for the train, so they'll have to wait at Leyden until the yard can take them.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1077
views
0
comments
Thursday, September 28, 2017 at 7:52:47 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Chemical (MP 14.5)




Train Information
Railroad
BNSF
Model
None
Unit Number
None

Symbol
HPVODEN1-27A
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
800
Flash
Did Not Fire

Focal Length
135 mm
Shutter
1/250 seconds
Aperture
f/9


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.