BNSF's Provo to Denver manifest has a trio of elephant-style GEs leading it into the siding at Leyden. DS-86 aligned the train into the siding with the intention holding it for Amtrak. However, the train made better-than-expected time down the east slope of the Moffat. As a result, DS-86 already has a clear signal setup for the train out the east end. The train will meet the Zephyr at C&S Junction. Note the sole DPU on the end of the (relatively short) train on the right side of the shot.
Email Questions or Comments to the Webmaster.