|
With the air test on DRGW 3006 completed and the brakes properly released, the conductor on the ground gives hand signals to the engineer to go ahead and pull to the south.
Email Questions or Comments to the Webmaster. | ||||
| ||||
|
| ||||||||
|
| ||||||||
| ||||||||
|
| ||||||||
| ||||||||
|
| ||||||||
|
|
|
|
With the air test on DRGW 3006 completed and the brakes properly released, the conductor on the ground gives hand signals to the engineer to go ahead and pull to the south.
Email Questions or Comments to the Webmaster. | ||||
| ||||
|
| ||||||||
|
| ||||||||
| ||||||||
|
| ||||||||
| ||||||||
|
| ||||||||
|
|
|