The engineers side of DRGW 3006 has faired a bit better than the conductors side. Not really any graffiti on this side of the GP30. Right now, the train is backing down to pull a DRGW caboose and a DRGW crane (formerly a D&SL crane) out of the storage track at Burnham.
Email Questions or Comments to the Webmaster.