Photo By: Kevin Morgan
 

This eastbound oil train has actually been one of the slower BNSF train to travel from Grand Junction to Denver. The Grand Junction crew could only make it as far as Rollins, and it took some time for BNSF to get a fresh crew up to take the train the rest of the way. Thus, the total time from Grand Junction to Denver was around 21 hours.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1195
views
0
comments
Thursday, May 24, 2018 at 8:54:24 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Chemical (MP 14.5)




Train Information
Railroad
BNSF
Model
C44-9W
Unit Number
BNSF 4978

Symbol
USLCFYN4-15A
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 7D
ISO
125
Flash
Did Not Fire

Focal Length
28 mm
Shutter
1/400 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.