Photo By: Kevin Morgan

This eastbound BNSF manifest had an approach signal at the west end of Leyden and, as such, the engineer was slowing the train in preparation to stop at the east end. However, by the time the train had the east signal in sight, it, too, was an approach. The manifest was following an eastbound coal load that was moving quite slowly, keeping the manifest on yellows.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1124
views
0
comments
Wednesday, July 11, 2018 at 8:33:16 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS012 (East Leyden)




Train Information
Railroad
BNSF
Model
None
Unit Number
None

Symbol
HPVODEN1-10A
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS-1D Mark III
ISO
160
Flash
Did Not Fire

Focal Length
260 mm
Shutter
1/400 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.