Photo By: Kevin Morgan
 

On a chilly October day (42°F), UP 1988 sits on the point of an eastbound coal load on the main at Tabernash as a few lazy clouds glide across the sky. The train, which loaded at Energy on the Craig Branch, is waiting for the eastbound Zephyr to pass by on the siding before it attempts to charge up the hill to the Moffat Tunnel. The train has been having some DPU issues, so the engineer cannot guarantee they will not stall out.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1505
views
0
comments
Tuesday, October 16, 2018 at 3:04:59 PM
image date



Location Information
City or County and State
Tabernash, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tabernash




Train Information
Railroad
Union Pacific
Model
SD70ACe
Unit Number
UP 1988

Symbol
CEYKS9-10
Paint Scheme  

Future Number(s)
UP 8396



Photo Information
Camera Make/Model
Apple / iPhone X
ISO
20
Flash
Did Not Fire

Focal Length
4 mm
Shutter
1/2000 seconds
Aperture
f/1.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.