After a fantastic day in the Colorado High Country along the Moffat, it is time for a parting shot of this eastbound coal load that has UP 1988 on the point. The train is starting to slow as the head end is now on the 2% grade. The train would ultimately slow to 5 MPH on its way up to the tunnel, but it did not stall out and ultimately made it over the top of the hill.
Email Questions or Comments to the Webmaster.