An SD70ACe-T4, an SD70M, and an SD70ACe lead an eastbound MRONY past some MOW equipment that is tied down on the siding at Cliff. UP recently replaced the bridge over South Boulder Creek located about halfway through the siding of Cliff. The old wood bridge was replaced with a new steel and concrete bridge.
Email Questions or Comments to the Webmaster.