An eastbound coal load goes a little out of the norm in terms of power as it has five units on the point instead of the usual two. In addition, UP 1996 is the third of the three mid-train swing helpers. the train is slowing in the siding at Rocky, waiting to meet two westbounds.
Email Questions or Comments to the Webmaster.