Railroad photograph
Photo by: Kevin Morgan
The head end of the Zephyr is just about to duck in Tunnel 1, having gained a few hundred feet since crossing Blue Mountain Road just out of the frame to the left. CO-72 heads up Coal Creek Canyon to the top-right.

Interestingly, when David Moffat was building the line in 1902, one of the possible routes surveyors considered would have taken the tracks straight up Coal Creek Canyon, where CO-72 disappears in the background. This would have necessitated a long tunnel (to get from present day Crescent Village to Pinecliff). It was largely due to this the railroad opted to instead take the current alignment along the Front Range to South Boulder Creek.
Email Questions or Comments to the Webmaster.

User Comments (0)

No comments posted yet. Click Here to add the first one!

1075
views
0
comments
Friday, June 19, 2020 at 08:52:48
image date



Location Information

City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tunnel 1 (MP 23.4, 366 ft)




Train Information
Railroad
Amtrak
Model
P42DC
Primary Unit Number
AMTK 172

Paint Scheme
Amtrak Phase 5b
Symbol
AMT5-18
Train Type
California Zephyr (Amtrak)


Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/320 seconds
Aperture
f/2.8