Photo By: Kevin Morgan

A look from above the MGJNY as it stops to align some switches in the yard at North Yard. The train is sitting on the North Yard siding, underneath one of the last-remaining Rio Grande signal bridges. If you are wondering why there are only two sets of signals, yet three tracks crossing under the bridge, it is because the track to the right of the train is not signaled. It is the North Yard Lead and the dispatcher cannot see that track on his or her display. Only the track the train is on (the siding) and the track to the left (the main) are visible to the dispatcher.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

759
views
0
comments
Saturday, July 4, 2020 at 7:20:40 AM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS003 (Utah Junction)




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
MGJNY-03
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
200
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/800 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.