Photo By: Kevin Morgan
 

A single unit leads a work train consisting of gondolas sits in the siding at Rocky, waiting on BNSF's Provo-Denver to show up. Once meeting the manifest, the work train here will proceed up and in to the siding at Eisele (Clay). The gondolas will be tied down there and the unit will return light back to North Yard.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

711
views
0
comments
Monday, July 27, 2020 at 9:32:13 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Little Ten Curve (MP 18.7 to MP 18.9)




Train Information
Railroad
Union Pacific
Model
AC4400CW
Unit Number
UP 5880

Symbol
ENYPLW-27
   



Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/640 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.