On the approach to Tunnel 27, the westbound Zephyr is nearing the end of the Tunnel District. Here toward the west end, South Boulder Creek is coming up to the level of the tracks. On the other side of Tunnel 27, which is about 650 feet long, the river will near the same level as the tracks.
Email Questions or Comments to the Webmaster.